摘要
提出了大型项目价值工程分析方法和流程,并将其应用于北京首都第二国际机场项目。从机场项目的建设过程及最终交付物两个方面对机场项目价值链进行了研究,得到了详细的机场项目价值列表。以项目利益相关者价值最大化为目标,在对首都第二机场四类可供选择的方案进行初步价值工程分析和筛选的基础上,采用改进的模糊质量功能展开法评价了四个潜在的新机场选址方案,得到了价值最优的场址方案。
This article puts forward the approach and the procedure for value engineering analysis of large-scale projects and applies them to the construction of the second Beijing Capital Airport. The value of the airport project is analyzed from the aspects of airport construction and facilities. A detailed list of the value of airport projectis presented. Four tentative schemes for the construction of the second Beijing Capital Airport are discussed with a view to achieving the maximal value. Finally, four altemativelocations for the new airport are evaluated using fuzzy Quality Function Deployment (QFD), of which the one that produces the maximal value is proposed.
出处
《北京航空航天大学学报(社会科学版)》
2006年第3期1-4,共4页
Journal of Beijing University of Aeronautics and Astronautics:Social Sciences edition Edition
基金
国家自然科学基金资助项目(70372011)
航空基金资助项目(20030006009)