摘要
论述了天铁石灰石矿生产现状,对改造现有大破碎生产系统,提高优质块矿产出率的必要性以及具体改造方案与可行性进行了探讨。
The status of the limestone ore in Tiantie Group is discussed. The necessity of rebuilding the existing large breaking system and improving the output ratio of high quality lump ore and the concrete rebuilding scheme as well as the feasibility are expounded.
出处
《天津冶金》
CAS
2006年第5期37-38,41,共3页
Tianjin Metallurgy
关键词
石灰石矿
破碎系统
块矿
产出率
改造
探讨
limestone ore
breaking system
lump ore
output ratio
rebuilding
discussion