摘要
沉淀池是污水处理流程中一个必不可少的重要环节,设计中存在着大量的不确定因素.本文在沉淀池设计中引入了不确定性模糊非线性规划模型.该模型利用处理效率与沉淀池尺寸之间的非线性关系,求解过程引入区间数和模糊算子,尝试在沉淀池设计中考虑不确定性因素,并取得满意的结果.
As one of integral important parts of the waste treatment plant, the Sedimentation tank accommodates much uncertainty in design, An inexact fuzzy nonlinear programming model is proposed in this paper. Given the nonlinear relationship between settling efficiency and the sizes of the sedimentation tank, the model attempts to consider uncertainty in designing and to induct interval numbers and fuzzy operators, Then ,it consequently obtains satisfied solution.
出处
《数学的实践与认识》
CSCD
北大核心
2006年第8期148-152,共5页
Mathematics in Practice and Theory
基金
国家杰出青年科学基金(50225926
50425927)
2000年教育部高等学校优秀青年教师教学科研奖励计划资助项目
国家863高技术资助项目(2001AA644020
2003AA644010)
关键词
不确定性
沉淀池
优化设计
模型
uncertainty
sedimentation tank
optimum
model