山东某化工污水处理厂设计规模为700m3/h,采用泥法串膜法的组合工艺处理取得了较好的效果:当进水COD为1800~2200mg/L时,出水COD为160~300mg/L。
With a combination of sludge method and membrane process in series, a 700m^3/h chemical sewage treatment plant was operated successfully and achieved better effect: when the influent COD concentration was 1800~2200mg/L, the effluent COD concentration was 160~300mg/L. In the paper, the basic technological flow, design parameter of the structures as well as the engineering debugging and commissioning conditions are put forward