摘要
以瑞明电厂烟气脱硫(FGD)工程为例,介绍了2×125 MW机组湿法烟气脱硫工程经济参数,给今后同类电厂FGD工程估概算编制及投标报价提供了确切的参考,亦为总承包工程费用控制提供了良好的基础。
Citing the flue gas desulfurization(FGD) project in Ruiming Power Plant for instance, this paper describes the economic parameters of wet FGD project for two 125 MW units, thus providing definite reference for the evaluation, estimation and bidding of similar power plant FGD projects in the future and laying a favorable foundation for expense control of turnkey projects.
出处
《广东电力》
2006年第8期24-26,共3页
Guangdong Electric Power
关键词
湿法脱硫
经济参数
费用控制
wet desulfurization
economic parameter
expense control