摘要
结合施工过程中的各项监测数据及堆场使用2年后的沉降情况,介绍SCT2地基处理工程的设计、施工情况,以及施工中存在的引孔、边界处理等主要技术问题及其解决办法。
Based on the analysis of the monitoring data during construction and the settlement of stacking yard surveyed after 2 years' operation, this paper introduces the design and construction of SCT2 Ground Treatment Engineering, and main technical problems such as drilling holes and boundary treatment, together with relevant solutions.