钢铁企业炼钢-连铸生产调度系统的应用 被引量:9

Application of Productive Scheduling System in Steelmaking-Continuous Casting Process
下载PDF
导出
摘要 描述了湘钢的炼钢-连铸生产调度系统。该系统能直观地显示生产流程的信息画面,在生产总调及主要工序(转炉、精炼、连铸)通过集成化的图形界面跟踪工单、计划的执行情况来及时反映完成工单、在制工单以及待制工单的信息。图形化动态生产计划的实时调整可极大地提高计划编制效率、降低生产人员的劳动强度,保证计划的规范性。系统投入实际生产后,不仅优化了生产过程,较大幅度地提高了钢厂的产能和品种钢比例,且实现了系统运行的高效性和连续性。 This paper describes productive scheduling system for steelmaking-continuous casting process in Xiangtan Iron&Steel Co Ltd. This system can directly display information interfaces in productive process, realize tracking implement condition and productive plan of work sheet through integrated graphical interfaces between general production dispatching office and main working procedures. Moreover, it can duly response those finished work sheets, on-line sheets, waiting for working sheets. The real-time adjustment of productive schedule with dynamic graphical interfaces can improve the efficiency of making plan, lower the working intensity and guarantee the standardization of plan. After using this system, not only productive process is optimized, but productive capability and ratio of high level steels also increased.
出处 《中国冶金》 CAS 2006年第9期39-44,共6页 China Metallurgy
基金 国家"863"计划"典型钢铁企业MES及产销一体化关键技术研究"项目基金资助(2004AA412060)
关键词 炼钢 连铸 生产调度 甘特图 制造执行系统 steelmaking continuous casting productive schedule system Gantt chart MES
  • 相关文献

参考文献8

  • 1朱宝琳,于海斌.炼钢-连铸-热轧生产调度模型及算法研究[J].计算机集成制造系统-CIMS,2003,9(1):33-36. 被引量:35
  • 2冯振军,杨根科,杜斌,黄可为.炼钢连铸调度的启发式和线性规划两步优化算法[J].冶金自动化,2005,29(4):18-22. 被引量:15
  • 3[3]Kevin R.GUE,George L.Nemhauser,Mario Padron.Production Scheduling in Almost Continuous Time[J].ⅡE Transactions,1997,(29):391-398.
  • 4[4]Mohammed F.Fahmy,MD Salim.A Model for Production Scheduling and Sequencing Using Constraints Management and Genetic Algorithm[R].Ahmad Nadeem Choudhry University of Northern Iowa,December,2000.
  • 5[5]Arthur V.Hill,Amitabh S.Raturi,Chee-Chuong Sum.Capacity-Constrained Reorder Intervals for Materials Requirements Planning Systems[J].ⅡE Transactions,1997,(29):951-963.
  • 6[6]Mark Lawley,Spyros Reveliotis,Placid Ferreira.Flexible Manufacturing System Structural Control and the Neighborhood Policy,Part2.Generalization,Optimization,and Efficiency[J].ⅡE Transaction,1997,29:889-899.
  • 7[7]H.Pierreval,L.Tautou.Using Evolutionary Algorithms and Simulation for the Optimization of Manufacturing Systems[J].ⅡE Transactions,1997,(29):181-189.
  • 8苏冬平,陈文明,罗首章,陈军鹏,周仁义,郝冠华,郑秉霖.人机交互调整炼钢连铸调度计划[J].冶金自动化,2005,29(3):17-20. 被引量:11

二级参考文献19

  • 1唐立新,杨自厚,王梦光.炼钢─连铸生产调度问题研究[J].钢铁,1996,31(11):27-30. 被引量:9
  • 2唐立新,杨自厚,王梦光,东北大学自动控制系.炼钢─连铸生产的计划与调度结构[J].东北大学学报(自然科学版),1996,17(6):664-667. 被引量:21
  • 3TANG LI-xin, LIU Jin-yi, RONG Ai-ying, et al. A review of planning and scheduling system and method for integrated steel production [J]. European J of Operational Research,2001,133(1): 1-20.
  • 4TANG Li-xin, Iuh Peter B,LIU Ji-yin, et al. Steel-making process scheduling using Lagrangian relaxation[J]. International Journal of Production Research,2002,40(1) :55-70.
  • 5ZHU Bao-lin, YU Hai-bin. Production scheduling model and algorithm for steel making-continuous casting-hot rolling processes [J]. Computer Integrated Manufacturing Systems(CIMS), 2003, 9(1): 33-36.
  • 6CHEN Hao-xun, Ihlow Juergen, Lehmann Carsten. A genetic algorithm for flexible job-shop scheduling [A]. ProceedingsIEEE International Conference on Robotics and Automation[C].Michigan:[s n],1999.1 120-1 125.
  • 7TANG Lixin;LIU Jiyin;YANG Zihou.A mathematical programming model for scheduling steelmaking- continuous casting production[J],2000(120).
  • 8TANG Lixin;LIU Jiyin;RONG Aiying.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baogang Iron & Steel Complex[J],2000(124).
  • 9Hoitomp D J;LUH P B.A practical approach to job-shop scheduling problems[J],1993(01).
  • 10Luh P B.An effective approach for job-shop scheduling with uncertain processing requirements[J],1999(02).

共引文献55

同被引文献167

引证文献9

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部