摘要
介绍了模板的常用类型以及模板应符合的要求,并从混凝土的运送、大体积混凝土浇筑、混凝土养护等方面对墩台混凝土的施工要点做了阐述,以保证墩台的施工质量。
It introduces the usual models and the requests should be agreed of shuttering and represents the pier board concrete construction points frcrn the aspects of concrete transportation, mass concrete pouring and concrete curing etc so as to ensure the pier board construction quality. Key words:mounting shuttering, concrete pouring, construction