摘要
介绍了分期建设工程中,室外工程综合管线的总体设计方法及分期施工遇到的问题,并提出解决方法,总结了管线的设计和施工注意要点,叙述了综合管线的施工程序,以合理控制管线工作。
General design method and problems encountered in stage construction of integrate pipeline works in project to be constructed in phases are introduced; at the same time corresponding resolving measures are proposed. In the end points deserving attention in design and construction are summarized in order ensure engineering quality.
出处
《山西建筑》
2006年第19期169-170,共2页
Shanxi Architecture
关键词
综合管线
管线设计
竖向控制工作
integrate pipeline, pipeline design, vertical control