摘要
本文介绍了风光互补电站的工作原理及其设计过程,并通过对电站建设地的资源调查和评估,合理有效地配置设备、容量,以降低成本,增加效益。
Introduce the working principle and design conception. In order to efficient cost and benefit, collocate the equipment and capacity efficiently by resource investigation and evaluation for construction terra of power station.
关键词
风光互补电站
设计
Solar-Wind Hybrid Power Station Design