摘要
在完成风电场风能资源评估工作后,风电场风力发电机组选型及机组的微观选址是风电场设计的重点,它将直接影响风电场建成后的经济效益。
After wind resources evaluation of wind farm,it is the key to select the wind generator unit and determine the micro site-choosing of generator unit, because they directly affect the economy benefit of wind farm finishing construction.
关键词
风电场
机组选型
微观选址
Wind Farm Unit Selection Micro Site-choosing