期刊文献+

华盛顿地铁福特—图特站的仿真反分析 被引量:16

The Simulation Back Analysis of Washington Subway's Fort-Totten Station
下载PDF
导出
摘要 在华盛顿地铁的修建过程中,应用了昂贵的实测系统,对浅埋隧道在分期开挖、支护的各个不同阶段进行了全面细致的实测。本文根据该工程的特殊情况,提出了不同于传统反分析的仿真反推分析思路与方法,得出的岩土力学参数对后续开挖、支护施工与设计具有很重要的依据作用。 in the course of Washington Subway construction, an expensive measurement systemis employed to carry out an overall and detailed field measurement of excavation in stages, support and protection in different sections in shallow buried tunnel. Based on the specific conditionsof this engineering, this paper puts forward the thinking and method of simulation back inferenceanalysis which is'different from the traditional back analysis whereby obtaining the geoengineering mechanics parameters which will play an important and basic role in the follow-up excavation, supporting and protecting construction and design of the tunnel.
出处 《西安理工大学学报》 CAS 1996年第4期324-329,共6页 Journal of Xi'an University of Technology
基金 奥地利自然科学基金 成都理工学院国家重点实验室开放基金
关键词 地铁车站 仿真反分析 浅埋洞室 施工过程 simulation back analysis shallow buried tunnel chamber tunnel constraction sequence
  • 相关文献

参考文献2

二级参考文献15

  • 1李宁,Swobo,G.爆破荷载的数值模拟与应用[J].岩石力学与工程学报,1994,13(4):357-364. 被引量:52
  • 2朱维申,1986年
  • 3杨淑清,武汉水利电力学院学报,1986年,73页
  • 4杨奇,1985年
  • 5张有为,动态规划导论,1985年
  • 6俞裕泰,地下工程,1984年,11期,31页
  • 7李宁,岩土工程学报,1994年,16卷,1期,9页
  • 8董继峰,计算机方法在岩石力学中的应用,1994年
  • 9孙钧,计算机方法在岩石力学中的应用,1994年
  • 10李宁,节理岩体中的波传播问题,1993年

共引文献47

同被引文献194

引证文献16

二级引证文献172

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部