通过福建省穆阳溪周宁水电站厂坝河段水电开发方案的研究,说明如何充分利用已建电站厂坝区间流量与落差进行水能资源开发,是河流规划中值得研究的一个新课题.
Through the research of the hydropower development scheme by applying the reach of the dam site of Zhouning Hydropower Station of Muyangxi river, how to use the intermediate flow and the water head of the built hydropower station to develop water energy was introduced. It is a new theme of river plan.
出处
《江西水利科技》
2006年第3期159-161,共3页
Jiangxi Hydraulic Science & Technology
关键词
开发方案
已建电站
厂坝区间河段
Development scheme
Built hydropower station
Intermediate reach of dam