摘要
介绍江西省大坳水利枢纽工程施工导流设计与施工,以及大坝施工期临时度汛措施等,可供类似工程参考借鉴.
The design and construction of the river diversion of Daao hydraulic engineering, the temporary. measures of flood period in constructing the dam were introduced. It can be referred by the analogic engineerings.
出处
《江西水利科技》
2006年第3期181-184,共4页
Jiangxi Hydraulic Science & Technology
关键词
大坳水利枢纽
施工导流
设计
度汛
Daao Hydraulic Project
River diversion
Design
Flood period