摘要
以罗长高速公路B2合同段为例详细介绍了无纤维SMA-13改性沥青表面层的生产与施工过程,提出了无纤维SMA-13混合料的施工工艺和工程质量控制要求,并对铺筑路段的使用性能进行了检测与分析。实践表明,只要施工管理得当,无纤维SMA可以较低的成本获得优良的路用性能。
Taking the Luochang highway B2 biding section as an example, this paper introduces the production and construction process of no fiber SMA-13 modified asphalt for pavement surface layer in detail. The construction technics and quality control demands of no fiber SMA-13 mixture are put forward and the pavement performance is tested and analyzed. The practice shows that no fiber SMA can get excellent performance with low cost as long as the construction process is managed in a suitable way.
出处
《筑路机械与施工机械化》
北大核心
2006年第9期26-28,共3页
Road Machinery & Construction Mechanization
关键词
无纤维SMA
沥青表面层
施工工艺
质量管理
no fiber SMA
asphalt surface layer
construction technic
quality management