三峡左岸电站计算机监控系统投运新模式

New Mode of Computer Supervisory System Commissioning in Three-Gorge Left Bank Power Station
下载PDF
导出
摘要 联合开发、联合调试,是三峡左岸电厂计算机监控系统投运中采用的新模式。本文详细介绍了联合开发与联合调试在三峡左岸电站中的具体实践及其重要作用,并探讨新的模式在右岸及其他监控系统投运中的借鉴意义。 Joint development and joint commissioning test is the new mode of computer supervisory system commissioning in Three - Gorge Left Bank Power Station. The specific practice of joint development and joint commissioning test in Three - Gorge Left Bank Power Station and its important role were introduced in detail, and the reference meaning of new mode of supervisory system commissioning for right bank and the other systems was discussed.
作者 谢秋华
机构地区 三峡水力发电厂
出处 《电力设备》 2006年第9期22-25,共4页 Electrical Equipment
关键词 三峡电站 计算机监控系统 联合开发 联合调试 Three-Gorge Power Station Computer Supervisory System joint development joint commissioning test