乐滩水电站工程施工组织设计的若干决策

Decisions on Construction Organization and Design for Letan Project
下载PDF
导出
摘要 文章叙述了乐滩工程工期紧迫,任务艰巨,准备期短,为了快速启动生产,迅速掀起施工高潮,在施工组织设计和措施上采取了一系列重大决策,取得了8个月内完成全部临建系统、一期围堰工程和厂坝开挖土石方172万m3的良好纪录。良好的开端是成功的一半,经验可供借鉴。 The paper presents the urgency of Letan Project. As the task poses great difficulty and its preparation period is short, a number of important decisions were made on construction organization, design and measures with a purpose to quickly start up production and bring about the peak of construction work. As a result, all temporary construction systems, first-phase coffering and 1,720,000m^3 earth rock excavation for the dam were completed in eight months. The experiences of the project can be described by the saying "A good beginning is half the battle" and serve as a reference.
作者 黄燕基
机构地区 广西水电工程局
出处 《红水河》 2006年第3期10-14,共5页 Hongshui River
关键词 施工组织 设计 决策 乐滩水电站 construction organization design decision making Letan Hydropower Station

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部