摘要
介绍了南山一级水电站的水源点及南山水库径流调节情况,论述了输水系统最大设计流量的优化。通过对南山水库的弃水由长滩坪抽水站对南山水库进行反调节、玉河溪水库的库容调整及其他径流调节措施,做到节省抽水耗能,充分利用水资源,增大枯水期南山水电站发电量,使工程达到最佳效益。
An introduction is made on the water sources of Nanshan Cascade No. 1 Hydropower Plant as well as the runoff regulation of Nanshan reservoir. The optimization of the maximum design flow of water transmission system is discussed. It is put forward that the surplus water of Nanshan reservoir can be re-regulated by Changtanping pump station, the storage capacity of Yuhexi reservoir can be regulated, and other runoff regulating measures be adopted,so as to save pumping energy consumption, make full use water resources, increase dry period electricity output of Nanshan hydropower plant and have the best project benefit.