简述巴江口水电站拦污栅与厂房分离布置设计的方式及其有异于常规设计的特点,经结构分析和水工模型试验以及施工便利方面等综合分析论证表明,这种布置方式使得电站布置更为合理与经济。
A brief introduction is made on the layout design of Bajiangkou hydropower plant that has separate trash rack from powerhouse and has characteristics different from normal design. The results of a comprehensive analysis in respects of structure, hydraulic model test and convenient construction etc. had demonstrated that this kind of layout is a more rational and economic scheme.