柔性资源受限的复杂产品协同开发项目调度研究综述 被引量:5

Review of the Collaborative Complex Product Development Project Scheduling Constrained with Flexible Resources
下载PDF
导出
摘要 综述了资源受限的复杂产品协同开发项目调度和企业柔性资源管理的研究现状,提出了新的研究方向———柔性资源受限的复杂产品协同开发项目调度。 Study of the collaborative complex product development project scheduling with constrained resources and flexible resource management is summarized. A new research issue is put forward which is the collaborative complex product development project scheduling constrained with flexible resources.
出处 《武汉理工大学学报(信息与管理工程版)》 CAS 2006年第10期77-79,86,共4页 Journal of Wuhan University of Technology:Information & Management Engineering
基金 国家自然科学基金资助项目(60574070)和(70271033)
关键词 协同产品开发 柔性资源 项目调度 collaborative product development resource flexibility project scheduling
  • 相关文献

参考文献19

  • 1KIDD J B.Do today's projects need powerful network planning tools?[J].International Journal of Production Research,2000(29):1969-1978.
  • 2PATTERSON J H.A comparison of exact approaches for solving the multiple constrained resources project scheduling problem[J].Management Science,1984,30 (7):854-867.
  • 3BRUCHER P,KNUST S,SCHOO A.A branch and bound algorithm for the resource constrained project scheduling problem[J].European Journal of Operational Research,1998 (107):272-288.
  • 4DEMEULEMEESTER E L,Herroelen W.A branch and bound procedure for the multiple resource constrained project schedule problem[J].Management Science,1992,38 (12):1803-1818.
  • 5MINGOZZI A,MANIFZZO V,RICCIARDELLI S.An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation[J].Management Science,1998,44 (5):714-729.
  • 6SPRECHER A.Scheduling resource constrained projects competitively at modest memory requirements[J].Management Science,2000,46 (5):710-723.
  • 7BRUKER P,DREXL A,MOHRING R.Resource constrained project scheduling:Notation,classification,models,and methods[J].European Journal of Operation Research,1999 (112):3-41.
  • 8DAVIS E W,PATTERSON J H.A comparison of heuristic and optimum solutions in resource constrained project scheduling[J].Management Science,1975,21 (8):944 -955.
  • 9KOLISCH R,HARTMANN S.Experimental investigation of heuristics for resource constrained project scheduling:An update[J].A preprint of an article accepted for publication in the European Journal of Operational Research,2005 (1):1-19.
  • 10DANIELS R L,MAZZOLA J.Flow shop scheduling with resource flexibility[J].Operations Research,1994,42 (3):504-522.

二级参考文献5

  • 1Daniels R L,Mazzola J B. Flow Shop Scheduling with Resource Flexibility[J]. Operations Research, 1994,(42):504~522.
  • 2Daniels R L,Hoopes B J,Mazzola J B. Scheduling Parallel Manufacturing Cells with Resource Flexibility[J]. Management Science, 1996, (42):1260~1276.
  • 3Sigurdur Olafsson,Shi Leyuan. A Method for Scheduling in Parallel Manufacturing Systems with Flexible Resource[J].ⅡE Transactions, 2000, (32): 135~ 146.
  • 4邓明然,钟丽萍,代继平.企业理财系统柔性及其评价研究[J].武汉汽车工业大学学报,2000,22(4):83-86. 被引量:22
  • 5邓明然.企业理财系统的不确定性剖析[J].科技进步与对策,2002,19(5):120-122. 被引量:7

共引文献11

同被引文献53

引证文献5

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部