期刊文献+

鱼雷武器系统基地级维修时间的模糊灰色模型 被引量:2

Fuzzy Grey Model of Base Level Maintenance Time for Torpedo Weapon System
下载PDF
导出
摘要 鱼雷武器系统3级维修中,基地级维修费用最高。为了合理利用资金,需预测基地级维修时间。根据模糊理论的思想,提出了灰色GM(1,1)模型的拓广形式——灰色AGM(1,1,ω)模型,并用层次分析法来确定最优加权因子,结合实例建立了鱼雷武器系统基地级维修时间预测模型。结果表明,这种方法能达到令人满意的精度,具有实用价值。 The maintenance cost of base level for torpedo weapon system is the highest in the three levels maintenance costs. The maintenance time of base level should be forecasted to use money in reason. Based on the thought of fuzzy theory, the AGM(1,1,ω) model is brought forward, which is developed form of grey GM(1,1) model. At the same time, AHP method is used in confirming the best weight value of the AGM(1,1,ω) model. As an example, a model of base level maintenance time model for torpedo weapon system is set up. Result indicates that this method can achieve satisfactory precision, and has practical value.
出处 《计算机工程》 EI CAS CSCD 北大核心 2006年第18期17-19,共3页 Computer Engineering
基金 国防"十五"预研课题 西北工业大学博士论文创新基金资助项目(CX200304)
关键词 鱼雷武器系统 基地级维修时间 模糊灰色AGM(1 1 ω)模型 层次分析法 Torpedo weapon system Base level maintenance time Fuzzy grey AGM(1,1,ω) model Analytic hierarchy process
  • 相关文献

参考文献3

  • 1Greene L.E.Life Cycle Cost (lcc) Milestones[C].Proceedings of the IEEE Aerospace and Electronics Conference,1991:1197-1200.
  • 2Zhang Yuea,Wang Guangyuanb,Su Fen.The General Theory for Response Analysis of Fuzzy Stochastic Dynamic Systems[J].Fuzzy Sets and Systems,1996,83 (3):369-405.
  • 3陈举华,史岩彬.GM预测模型的模糊-灰色优化方法[J].农业机械学报,2003,34(2):129-131. 被引量:11

二级参考文献2

共引文献10

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部