摘要
运用模糊数学理论对建筑装饰工程进行快速报价。通过引入隶属度、贴近度的概念和贴近度最大原则,来优选典型工程,提高了装饰工程的快速报价的准确性。
The theory of fuzzy mathematics is used to quoted price for the build decorate engineering. The method applies the degree of membership and the similarity-measure to select the most similar projects. The method improves the accuracy of quoted price.
出处
《四川建筑科学研究》
北大核心
2006年第4期213-215,共3页
Sichuan Building Science
关键词
快速报价
模糊数学
隶属度
贴近度
speediness quoted prigc
fuzzy mathematics
degree of membership
similarity-measure