期刊文献+

兰州重离子加速器冷却储存环主环加速过程的束流反馈 被引量:2

Beam Feedback Loops of RF Acceleration System of Heavy Ion Research Facility at Lanzhou-Cooler Storage Ring/Main Ring
下载PDF
导出
摘要 正在建设中的兰州重离子加速器冷却储存环(HIRFL-CSR)主环用于束流的加速。在加速过程中,为了保证束流的谐振加速,须准备2个束流反馈环(相位反馈环和束流径向位置反馈环)来保证主导磁场与高频频率的同步。本文基于Laplace变换及数值计算结果,分析了束流反馈环对同步加速器中束流动力学行为的影响。 Heavy ion research facility at Lanzhou-cooler storage ring (HIRFL-CSR) is being constructed. It consists of a main ring (CSRm) and an experimental ring (CSRe). The aim of the main ring is to accelerate the heavy ion to high energy. For synchronization between bending magnet field and RF frequency during acceleration process, two beam feedback loops for the frequency control are needed. One is the phase loop and the other is the radial position loop. The effects of these loops on the beam dynamics in the synchrotron are analysed on the basis of Laplace transformation and some numerical calculations.
出处 《原子能科学技术》 EI CAS CSCD 北大核心 2006年第5期620-624,共5页 Atomic Energy Science and Technology
基金 国家大科学工程--兰州重离子加速器冷却储存环(HIRFL-CSR)项目资助
关键词 同步加速 高频控制 束流反馈 synchronous acceleration RF control beam feedback
  • 相关文献

参考文献2

  • 1ZHANG Wenzhi,XU Zhe,YANG Xiaodong,et al.RF accelerating system at HIRFL-CSR main ring[C]//Proceedings of the 2003 Particle Accelerator Conference.Portlant,USA:[s.n.],2003:1 288-1 290.
  • 2张文志,陆晓文,徐向阳,夏佳文,魏宝文.HIRFL-CSR束流加速过程的模拟[J].原子能科学技术,2000,34(2):142-145. 被引量:2

二级参考文献2

共引文献1

同被引文献21

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部