摘要
介绍了万家寨水电站水轮发电机组进相运行试验过程、进相运行范围和对系统的调压效果。进相试验分别在90、144、180 MW 3种不同的有功下完成,通过试验确定了机组的进相深度。
It introduces leading phase operation test of turbogenerator set, and voltage-adjusting effect of the system. The leading phase operation tests were carried out under active powers of 90, 144 and 180 MW respectively, in order to determine the leading phase depth of generating sets on the basis of tests.
出处
《西北水电》
2006年第3期66-68,共3页
Northwest Hydropower
关键词
进相运行试验
电压
调压效果
水轮发电机
leading phase operation test
voltage
voltage adjusting effect
turbogenerator set