摘要
通过对河南省新三义寨引黄工程1994年4月试通水以来,渠道边坡坍塌现象的分析和研究,找出了渠道坍塌的原因,并提出了相应的防治措施。
By analysing and studying canal embankment sliding in Xinsanyizhai Yellow River Water Diversion Work, having been put into operation since April, 1994, the reasons for canal embankment sliding and a preventing method have been given in this paper, which can be a reference for canal designers and operators in Yellow River Water Diversion works.
出处
《河南科学》
1996年第4期423-427,共5页
Henan Science
关键词
坍塌
防治
黄河
引水工程
渠道
边坡
Canal in Yellow River water diversion works,Canal embankment sliding,Reasons,Method for preventing canal embankment sliding