基于蚁群算法求解混流装配线传送带中断问题 被引量:4

Solving of Conveyor Stoppage of Mixed-Model Assembly Line Based on Ant Colony Algorithm
下载PDF
导出
摘要 将可扩展工作域概念引入混流装配线中的传送带中断问题,研究了该问题的相关性质:装配线中断发生的充分必要条件,目标函数的边界等.在此基础上,设计了约束集-蚁群算法求解环型油漆车身缓冲区约束下,以传送带中断时间最短为目标的汽车制造排程问题.算例验证了文中解决策略的优越性,同时显示了物料流平准化对传送带中断的影响. The concept of extendable region is introduced to solve the conveyor stoppage problem on a mixed-model assembly line, and some problems, such as the necessary and sufficient conditions due to which the conveyor stoppage may occur, and the bounds of the objective function are studied. Then, a restricted-ACO (Ant Colony Optimization) algorithm is proposed to solve the car-sequencing problem with buffer restriction under a round painted body storage, which reaches the objective to minimize the total conveyor stoppage time. Illustrations are finally presented to reveal the advantages of the proposed strategy and the effect of the leveling of material flow on the conveyor stoppage.
作者 叶明 王宁生
出处 《华南理工大学学报(自然科学版)》 EI CAS CSCD 北大核心 2006年第9期31-34,39,共5页 Journal of South China University of Technology(Natural Science Edition)
基金 国家863高技术研究发展计划资助项目(863-511-910-403)
关键词 汽车排程问题 蚁群算法 混流装配线 传送带中断 car-sequencing problem ant colony algorithm mixed-model assembly line conveyor stoppage
  • 相关文献

参考文献10

  • 1Zhao Xiao-bo,Katsuhisa Ohno.A sequencing problem for a mixed model assembly line in a JIT production system[J].Computers and Industrial Engineering,1994,27(3):71-74.
  • 2Zhao Xiao-bo,Katsuhisa Ohno.Algorithms for sequencing mixed on an assembly line in a JIT production system[J].Computers and Industrial Engineering,1997,32(1):47-56.
  • 3Zhao Xiao-bo,Katsuhisa Ohno.Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages[J].European Journal of Operational Research,2000,124(3):560-570.
  • 4Celano G,Costa A.Human factor policy testing in the sequencing of manual mixed model assembly lines[J].Computers & Operations Research,2004,31(1):39-59.
  • 5Yan H S,Xia Q F,Zhu M R,et al.Integrated production planning and scheduling on automobile assembly lines[J].IIE Transactions,2003,35(8):711-725.
  • 6严洪森,夏琦峰,朱旻如,刘霞玲.汽车装配车间生产计划与调度的同时优化方法[J].自动化学报,2002,28(6):911-919. 被引量:27
  • 7Kis T.On the complexity of the car sequencing problem[J].Operation Research Letters,2004,32(4):331-336.
  • 8梁黎明,汪国强.求解流水车间调度问题的一种混合式遗传算法[J].华南理工大学学报(自然科学版),2001,29(11):85-88. 被引量:5
  • 9Varadharajan T K,Rajendran C.A multi objective simulated-annealing algorithm for scheduling in flow shop to minimize the makespan and total flowtime of jobs[J].European Journal of Operational Research,2005,167(3):772-795.
  • 10Dorigo M.Ant colonies for the traveling salesman problem[J].BioSystem,1997,43:73-81.

二级参考文献3

共引文献30

同被引文献37

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部