期刊文献+

低水温、低有机负荷条件下CAST工艺城市污水处理厂的启动调试及活性污泥培养 被引量:10

Activated Sludge Culture and Preliminary Test of Wastewater Treatment Plant with CAST Craft at Low Temperature and Low Nutrition
下载PDF
导出
摘要 目的为北方城市污水处理的CAST工艺在冬季进水温度低和有机负荷低的条件下进行启动调试及活性污泥培养驯化提供经验,促进该工艺在寒冷地区的推广应用.方法采用接种法培养活性污泥,通过控制曝气量以减少曝气过程中的热量损失.结果在冬季进水温度低和有机负荷低的条件下,采用接种法培养驯化活性污泥20 d就能完成污泥培养驯化,满足污水处理要求,使出水达到了设计标准.结论北方城市污水处理的CAST工艺在冬季启动调试及活性污泥培养时,采用接种法培养活性污泥能够克服有机负荷低的缺点,控制曝气量能够减少进水热量的损失,避免进水温度降低,为微生物的生长创造了条件,提高了污水处理效果. The purpose of the article is to supply experience for activated sludge culturing and domesticating and start running for wastewater treatment plant with CAST type of SBR process at the low inlet temperature and the low nutrition in the winter of northern area, and promotes the application of this craft. Inoculation method is used to culture activated sludge, and to reduce the heat loss by adjusting the quantity of aeration. The results show that sludge culturing and domesticating is completed by twenty days using inoculation method in winter, and the outlet quality meets the design standard. Hence, it is an effective way for the plants in northern cities to adopt inoculation to culture activated sludge and adjust the quantity of aeration at the low inlet temperature and the low nutrition in winter.
出处 《沈阳建筑大学学报(自然科学版)》 EI CAS 2006年第5期795-798,共4页 Journal of Shenyang Jianzhu University:Natural Science
基金 建设部攻关项目(03-2-068) 沈阳建筑大学省级重点实验室开放基金资助课题(HT-200605)
关键词 污水处理厂 CAST工艺 活性污泥 培养驯化 wastewater treatment plant CAST craft activated sludge culture and domesticate
  • 相关文献

参考文献9

二级参考文献12

  • 1张大群,王秀朵.SBRI艺新DAT-IAT法及新型滗水器[J].中国给水排水,1996,12(1):26-29. 被引量:21
  • 2沈耀良,李勇.AB工艺原理的系统分析[J].环境科学,1996,17(6):81-83. 被引量:7
  • 3沈耀良,环境科学,1996年,17卷,6期,50页
  • 4Demoulin G, Rudiger A, Goronsky M C. Cyclic activat ed sludge technology-recent operating experience with a 90000p. e. plant in Germany[J]. War Sci Tech,2001,43(3) :331 - 337.
  • 5Livingston A G. Extractive Membrane bioreactors: a New procgss Technology For detoxifying chemical inimical industry wastewater[J ]. Chemistry biotechnoogy, 1994, (60) :117- 124.
  • 6WU W, Timpany P, Dawson D. Simulation and application of a novel modified SBRfor biological removal[J]. War SCi Tech, 2001,43(3) :215 - 222.
  • 7Keller J, Watts S, Battye-Smith Wet at. Full-scale demon stration of biological nutrient removal in a single tank SBR process[ J ]. War SCi Tech, 2001, 43 ( 3 ): 355 -362.
  • 8Chong R W, Flinder A, Krogh C, et al. Retrofitting of intermittent decanted extended aeration, (IDEA) plant for enhanced phosphorus removal [ J ]. War Sci Tech, 1999, 39(1): 151 - 158.
  • 9王洪臣.城市污水处理厂--运行控制与维护管理[M].北京:科学出版社,1999..
  • 10强绍杰,黄政新,鲁俊伦,吴园文.CASS 工艺在啤酒废水处理中的应用[J].给水排水,1998,24(3):30-32. 被引量:11

共引文献104

同被引文献78

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部