摘要
应用坝工水力学理论,分析了影响土石过水围堰溢流工况的主要不确定因素及其分布,提出了不利溢流工况的设计风险率计算模型。
Based on the hydraulics theory of dam project, the main indefinite factors affecting overflow condition of earth - rock overflow cofferdam are analyzed and the calculating model of designing risk rate which is unfavorable to overflow condition is established .
出处
《青海大学学报(自然科学版)》
2006年第5期19-21,共3页
Journal of Qinghai University(Natural Science)
关键词
土石过水围堰
溢流工况
系统风险率
overflow earth - rock cofferdam
the condition of overflowing
system risk ratio