摘要
本文从核电工程的投资、进度和质量三大控制出发,简要介绍了核电站建设期间设备采购管理系统的需求分析、网络配置、编码设计、系统功能划分。
The paper describes the ideas and practice method for requirement analysis,system function dividing,code design,program design and network disposition of equipment purchase management system of nuclear power plant during Building,from the view of engineering investment control,schedule control and quality control.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1996年第6期558-562,共5页
Nuclear Power Engineering
关键词
核电站
设备管理
数据库
设备编码
Nuclear Power Plant Eguipment management Database Equipment Code Contract Schedule