7Durward K.Sobek Ⅱ,Allen C.Ward and Jeffery K.Liker.Toyota's Principles of Set-Based Concurrent Engineering[J].Sloan Management Review.Winter 1999:67-82.
二级参考文献18
1Akira Takeishi,Takahiro Fujimoto,"Modularization in the Auto Industry: Interlinked Multiple Hierarchies of Product, Production, and Supplier Systems," 2001, http://web. mit. edu/afs/athena/org/.
2Kirsten Foss & Link, "The Modularization of Products and Organizations: Improving LeadTime in Product Development,"April 2001, http://www. cbs. dk/link/papers.
3Staffan Gullander and Anders Larsson,"Outsourcing and Location," working paper, May 23-26, 2000, http://www. snee. org/mzpap, htm.
4Frank Piller and Ralf Reichwald,"Strategic Production Networks,'Tsinghua University Press,Beijing, 2000.
5Michael Borrus,"Left for Dead: Asian Production Networks and the Revival of US Electronics,'BRIE Working Paper 100, April 1997.
6Michael Borrus and John Zysman,"Wintelism and the Changing Terms of Global Competition.. Prototype of the future?", Berkeley Roundtalbe on International Economy, Working Paper 96, February 1997.