摘要
在京广线六期提速站场改造施工中,我们充分利用列车“天窗点”,集中连续要点,顺利完成点内纵移60kg/m-1/12固定型提速道岔,最大横移为21m,最大纵移为968m,确保要点施工的有序进行。
In the reconstruction of the speed-up site of Beijing-Guangzhou railway, the construction unit made full use of train's skylight point and concentrated the successive key points to move longitudinally the 60kg/m-1/12 fixed speed-up swift successfully. The maximum lateral shift of it is 21m and the maximum longitudinal shift is 968m. It guaranteed that the construction of key point went well as planned.
出处
《石家庄铁路职业技术学院学报》
2006年第3期41-45,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
提速道岔
换铺
要点施工
speed-up swift swift renewal key point construction