摘要
介绍了武钢第二炼钢厂3号连铸机改造设计先后经历国内全厂连铸机改造总体设计、3号连铸机设备选型、工艺布置方案优化、新技术配置及国内、外联合设计全过程及建成投产后的生产情况。
Equipment selection, process arrangement, new technology adoption for No. 3 caster revamping at No. 2 Steelmaking Plant in WISCO was introduced. Whole procedure for the allied design by both domestic and international parties was investigated. The start up and the status after being put into operation are also introduced for the revamping project.
出处
《连铸》
2006年第5期8-10,共3页
Continuous Casting