摘要
介绍沈阳市富民桥边跨及中跨的合龙施工、结构体系转换和主梁线形控制措施。
This paper presents the closure construction for side and main spans of Fumin Bridge in Shenyang, including the structural system transformation and geometric control measures for the overall main girder.
出处
《桥梁建设》
EI
CSCD
北大核心
2004年第B05期54-57,共4页
Bridge Construction
关键词
斜拉桥
合龙施工
体系转换
线形控制
cable-stayed bridgel closure construction
system transformation
geometric control