基础的设计和计算方法与基础形式有很大关系,浅置基础与深基础的计算原理明显不同,深基础的计算一般较复杂。因此,从基础埋置深度的确定和基础的验算内容两方面分析明挖扩大基础的设计与计算,具有重要的实践意义。
Design and calculation of foundation is related with the foundation format greatly. The calculation principle of shallow foundation is different with deep foundation obviously and calculation of deep foundation is more complicated. Therefore, it is meaningful in practice that designs and calculates for open- cut foundation from two aspects which are bury length determining and checking computation contents of foundation.