摘要
根据盘石头水库工程所处地理位置和气候特点,为了适应高温干燥气候下的施工条件及工期要求,采取了补偿收缩混凝土技术以及无轨滑模施工工艺,确保了大坝面板混凝土的质量,为北方地区混凝土面板施工提供了可借鉴的范例.
In order to meet the needs of execution conditions and time limit for a project under the dry climate of high temperature, the compensated and shrunk concrete technology and the construction craft of trackless slippery model are adopted, which ensures the quality of the dam panel concrete. The practice can be drawn lessons from for the concrete panel construction of the northern area.
出处
《华北水利水电学院学报》
2006年第4期20-22,共3页
North China Institute of Water Conservancy and Hydroelectric Power
关键词
面板堆石坝
补偿收缩混凝土
无轨滑模
rock-fill dam with face slab
the compensate and shrink concrete
trackless sliding fromwork