针对“十五”以来江苏省内已经投运和正在建设的脱硫机组情况,从环境保护、投资和运行费用等方面进行综合性分析,对今后燃煤电厂的脱硫在减少投资和节约运行费用等方面提出一些设想,供有关方面参考。
A brief introduction of FGD projects in jiangsu province since the tenth-five year plan are presented. Desulfurizing units have been put commercial operation or under construction. The comprehensive analysis are proposed from environmental protection, investment and operation cost. The ideas of reducing the costs are described.
出处
《电力环境保护》
2006年第5期54-57,共4页
Electric Power Environmental Protection
关键词
烟气脱硫
GGH
电价加价
运行费用
flue gas desulfurization
GGH
electrical price plus
operating cost