摘要
甬台温高速公路瑞安段软基施工过程中采用真空预压处理,取得了良好的成效,工期提前,工后沉降减少,经济效益和社会效益显著。
Through reinforce of soft foundation at the Rui, an Part of Yong- Tai- Wen Expressway by Vacuum Preloading Method, the work finished in advance, And the settlement amount decreased. The method has greatly improved in the economical performance and social, performance. It has got the expected result.
出处
《浙江交通职业技术学院学报》
CAS
2006年第3期1-4,共4页
Journal of Zhejiang Institute of Communications
关键词
真空预压
工后沉降
经济效益
Vacuum Preloading
Residual settlement
Economical preformance