以某工程2×5000t/d水泥熟料生产线的电气设计和安装实施为例,详细分析了设计中的不足和缺陷;并就现场安装和调试过程所采取的针对性的变更和处理措施进行了总结介绍;同时提出了类似大型水泥厂电气设计中需改进和注意的问题。
Analysed in detail the deficiency and shortage in design and installation of electrical system of one 2×5 000 t/d clinker production line. And introduced the related alteration and measures in the commissioning process, at the same time, brougth forward the problems needed to be improved and noticed in design electrical system for similar large cement plant.