三峡永久船闸F_(1096)断层复合灌浆处理及效果检验 被引量:7

Compound-grouting and effect-verficating at fault F_(1096) under permanent shiplock of Three Gorges Project
下载PDF
导出
摘要 三峡永久船闸F1096断层斜穿永久船闸南坡五级阀门井结构,影响船闸的安全运行。通过对其进行水泥、化学复合灌浆,在施工过程中根据揭示的地质情况,灵活采用了高喷冲洗、高压旋喷灌浆的手段进行综合处理,并在灌浆过程中及灌后采用了压水、弹模、声波等多种手段检测其效果,结果表明基本满足了设计要求。 The fault F1096, crossing the fifth tap-pit at the south side of the ship-lock in Three Gorges Project, affects the safe operation of shiplock. The fault F1096 is dealt with compound cement grouting and chemical grouting. Based on the geological conditions found in the process of construction, some comprehensive measures such as jet grouting and jet washing are used flexibly. The quality of the compound-grouting construction is controlled and evaluated with multiple methods, the results show that the quality meets the requirements of the design.
出处 《水力发电学报》 EI CSCD 北大核心 2006年第5期102-106,共5页 Journal of Hydroelectric Engineering
基金 重庆市高等学校优秀中青年骨干教师资助计划(渝教人[2005]2号) 重庆大学高层次人才科研基金(200518)
关键词 地基基础工程 复合灌浆技术 效果检验 断层区 水利工程 ground foundation engineering compound-grouting effect-verficating fault zone hydraulic project
  • 相关文献

参考文献3

  • 1祝红,陈珙新.三峡永久船闸f1096断层处理设计与施工的主要技术特点.2004水利水电地基与基础工程技术[M].赤峰:内蒙古科技出版社,2004.10.
  • 2姜命强,曾绍军,文海家.三峡水利枢纽永久船闸一闸室南侧山体防渗墙施工[J].地下空间,2003,23(3):246-249. 被引量:3
  • 3姜命强,何培章.三峡水利枢纽左岸电站厂房结构缝渗漏处理施工.2004水利水电地基与基础工程技术[M].赤峰:内蒙古科技出版社,2004.10.

共引文献2

同被引文献65

引证文献7

二级引证文献89

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部