摘要 比较全面地介绍了遂渝铁路引入线第2标段龙凤隧道下穿渝合高速公路尖山子隧道的施工方法。从施工总体原则与要求着手,依次介绍了主要施工步骤与方法:管棚施工、开挖及支护、施工监测、仰拱与衬砌施工等,同时简要介绍了应采取的相关防护措施、应急保证措施。 The paper presents the construction method adopted for the construction of Longfeng tunnel on bid 2 section of approach line of Sui-Yu railway, which penetrates across underneath the existing Jianshanzi tunnel on Yu-he highway. From the general principles and requirements for the tunnel construction, the paper presents in detail such tunnel construction sequences as installation of pipe-roof protection, excavation and reinforcement, measurement and monitoring, installation of invert and lining. Furthermore, the paper briefly presents the protection measures and contingency countermeasures taken for the tunnel construction.
作者 傅强 张细宝
机构地区 中铁五局一公司
出处 《隧道建设》 2006年第5期66-69,共4页 Tunnel Construction
关键词 隧道 下穿 施工方法 tunnel penetrating across underneath existing tunnel construction
  • 相关文献

参考文献2

  • 1[2]TB10204-2002,铁路隧道施工规范[S].北京:中国铁道出版社,2002.
  • 2[2]钟桂彤.铁路隧道[M].北京:中国铁道出版社,1987.

共引文献1

同被引文献14

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部