赢得值原理在工程设计进度和费用控制中的应用 被引量:7

Application of Earned Value Principle in Engineering Progress and Cost Control
下载PDF
导出
摘要 赢得值分析法是一种能全面衡量工程进度、费用状况的整体方法,基本要素是用货币量或资源消耗量代替工程量来测量工程的进度,是一种完整和有效的工程项目监控指标和方法。工程实践证明,合理地应用赢得值理论对设计工作进行有效的动态监控,对设计阶段人工时进行详细而量化的分析,可以找出存在问题和发展趋势,以确保项目设计工作的正常开展。 Earned value analysis is an integrated method for general measurement of project progress and cost status and an efficient project monitor and control index,basically it applies currency quantity or resource consumption quantity instead of engineering quantity to measure project progress. It is proven that the earned value theory is able to identify outstanding problems and development tendency to assure normal operation of engineering design as long as it is properly applied to dynamic and efficient monitoring on engineering design and detailed and quantitive analysis on man-hour in engineering design stage.
出处 《天然气与石油》 2006年第5期57-62,共6页 Natural Gas and Oil
关键词 赢得值 工程 进度 费用 控制 Earned value Project Progress Cost Control
  • 相关文献

参考文献3

  • 1刘易斯.项目计划、进度与控制(第三版)[M].赤向东译.北京:清华大学出版社,2002.111—123.
  • 2罗德尼·特纳.项目管理手册-改进过程、实现战略目标(第二版)[M].任伟,石力,魏艳蕾译.北京:清华大学出版社,2002.173-201.
  • 3约翰.古德帕斯丘.项目价值管理[M].北京广联达惠中软件技术有限公司译.北京:机械工业出版社.2005.69-83

共引文献1

同被引文献15

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部