摘要
针对大连港大窑湾港区三期工程工期紧、陆域形成方式较为复杂的工程特点,堆场区分别采用了振冲置换加强夯法、真空联合堆载预压法和强夯法进行地基处理,而场桥轨道梁区采用了预制桩、锥型锤强夯等地基处理设计方案,可为类似工程设计提供参考。
In the light of the engineering characteristics of Dayaowan Port Area Phase Ⅲ Project of Dalian Port, i.e., pressing construction period and complicated land formation scheme, vibro-floatation combined with dynamic compaction, vacuum combined with surcharge preloading, and dynamic compaction were adopted for the ground under the storage yard; and precast piles and dynamic compaction with cone hammers were applied for the ground under the rail bearer of gantry crane. The engineering experience may serve as a reference for similar engineering design.
出处
《水运工程》
北大核心
2006年第10期179-183,共5页
Port & Waterway Engineering
关键词
大窑湾三期
地基处理
振冲置换加强夯法
真空联合堆载预压法
强夯法
Dayaowan Phase Ⅲ Project
ground improvement
vibro-floatation combined with dynamic compaction
vacuum combined with surcharge preloading
dynamic compaction