2[3]William Wrennall. Facilities Planning and Design: A Foundation of the BPR Pyramid [J]. Industrial Management, 1997(July/August): 7~ 11.
3[4]Kusiak A and Heragu S S. The facility layout problem[J]. Eur J Oper Res, 1987(29) :229~251.
4[5]Russell D M and Gau K Y. The Facility Layout Problem: Recent and Emerging Trends and Perspectives[J]. Journal of Manufacturing Systems, 1996, 15(5): 351~366.
5[6]Islier A A. A genetic algorithm approach for multiple criteria facility layout design [J]. INT J PROD RES,1998, 36 (6): 1549~ 1569.
6[7]Chen C W and Sha D Y. Adesign approach to the multi-objective facility layout problem [J]. INT J PROD RES, 1999, 37 (5): 1175~1196.
7[8]Lari M B. Layout designs in cellular manufacturing[J]. EurJ Oper Res, 1999(112): 258~272.
8[9]Rosenblatt M. The dynamics of plant layout [J],Management Science, 1986(32): 76~ 86.
9[10]Rosenblatt M J and Kropp D H. The single period stochastic plant layout problem [J]. IIE Transactions, 1992(24): 169~ 176.
10[11]Kouvelis P, Kurawarwala A and Gutierrez G. Algorithms for robust singleand multiple period layout models for manufacturing systems [J]. Eur J Oper Res, 1992(63): 287~303.
10Djassemi M. Improving Factory Layout under a Mixed Floorand Overhead Material Handing Condition[J]. Journal ofManufacturing Technology Management, 2007, 18(3):281-291.