期刊文献+

架空送电线路铁塔基础扭转偏差的探讨

Inquisition into Torsion Deflection of Tower Foundation for Overhead Transmission Lines
原文传递
导出
摘要 针对高压架空送电线路实际施工中的基础扭转偏差问题,对施工及验收规范有关整基基础扭转条文进行探讨,提出了基础扭转偏差应为基础回填夯实后实际的两轴线与设计要求的两轴线之间的角度偏差。转角塔基础的两个轴线应该由设计根据导线布置、电气间隙及铁塔、基础的荷载情况计算确定。 Pointing to the deflection problem of foundation torsion in construction of HV overhead transmission lines the author investigates into the clauses about integral foundation torsion specified in the construction and acceptance specifications and puts forward that the deflection of the foundation torsion is the angular deflection between the actual 2 - axial line after the foundation has been back filled and ramped and the 2 - axial line required by the design. The 2 - axial lines of the angle tower foundation should be designed and calculated according to the conductor arrangement, electrical gap, load of tower and foundation..
作者 吕桂强
出处 《电力建设》 2006年第9期25-27,共3页 Electric Power Construction
关键词 基础分坑 验收规范 基础扭转 偏差 foundation pits acceptance code foundation torsion deflection
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部