摘要
建筑方案的建构应当是在某些外在环境条件和建筑内部自身功能要求相互制约下形成的;其过程是一个合乎逻辑的、理性的、同步思维过程。结合东航锦江大酒店二期扩建方案设计,介绍如何从特定的基地环境及建筑功能要求入手,进行方案的构思。
An establishment of a construction proposal/approach is formed through interactive restraint of internal functions and external environment of the construction. The formation of a construction scheme is based on a procedure of logicality, rationality and consistent thinking. According to the extension scheme (phase-Ⅱ ) of Donghang Jinjiang Hotel, it is introduced how to establish a scheme through specific, fundamental environment as well as the funtions of a construction.
出处
《工业建筑》
CSCD
北大核心
2006年第9期102-103,共2页
Industrial Construction
关键词
环境
整体设计
同步设计
environment ensemble design synchronous design