大跨径连续箱梁加固新浇混凝土裂缝原因及控制 被引量:5

Cause Analysis and Treatment Measure on Cracks in New Reinforced Concrete Restricted by Old Web Concrete
下载PDF
导出
摘要 介绍了一座主跨80 m的多跨预应力混凝土变截面连续箱梁主桥,在维持通车情况下在箱内浇注大批量混凝土,但新浇腹板混凝土受到旧腹板约束而引起收缩裂缝,对新增混凝土裂缝情况介绍、原因分析及控制措施。 In this paper, the cause analysis about cracks on the new concrete web poured in multi -span continuous box -girder of a main bridge was introduced. This bridge is a prestressed concrete one with variable cross sections and an 80 -meter main span. When casting reinforced concrete in large volume in box girder during vehicle transport service, the shrinkage cracks in cast -in place reinforced web concrete were formed due to the restriction of old web concrete. Then, the control measure taken on these cracks is discussed.
作者 林宝珠
出处 《重庆建筑大学学报》 EI CSCD 北大核心 2006年第5期63-65,82,共4页 Journal of Chongqing Jianzhu University
关键词 加固 多跨连续箱梁 新浇腹板混凝土裂缝 控制措施 reinforcement multi -span continuous box girder new web concrete cracks control measure
  • 相关文献

参考文献7

二级参考文献10

共引文献380

同被引文献36

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部