期刊文献+

Hydropower at High Tide:Unprecedented Input and Appeal for Top Closing

Hydropower at High Tide:Unprecedented Input and Appeal for Top Closing
下载PDF
导出
摘要 After four years' extensively scrambling rivers' exploitation rights by power companies, the countable hydropower resources are almost shared up. In water-abundant southwestern region, five large generation groups delimited their own spheres on large rivers. Sharp private enterprises availed themselves of every opportunity to grasp the targets on small and medium rivers. As numerous investors swarmed, hydropower construction entered a real high tide period. 'At present, the proportion of exploited hydroenergy is approximately 20% of the exploitable water energy in China. It will be enough for the datum to be close to 60% in China, otherwise more problems with ecological environment would follow. The hydropower to be developed shall be limited within 350 GW, and this is the top,' said Wang Shucheng, Minister of Ministry of Water Resources . 'Excessive marketization is likely to lead endless trouble in hydropower construction. In case the investment in a hydropower project fails, the destroy to ecological environment are very difficult to be restored,' said Peng Tubiao, chief engineer from China Hydropower and Water Resources Planning and Design institute. After four years' extensively scrambling rivers' exploitation rights by power companies, the countable hydropower resources are almost shared up. In water-abundant southwestern region, five large generation groups delimited their own spheres on large rivers. Sharp private enterprises availed themselves of every opportunity to grasp the targets on small and medium rivers. As numerous investors swarmed, hydropower construction entered a real high tide period.
出处 《Electricity》 2006年第3期20-22,共3页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部