期刊文献+

Golden Nuclear Power:A Big Cake of Irresistible Temptations

Golden Nuclear Power:A Big Cake of Irresistible Temptations
下载PDF
导出
摘要 By 2020, the nuclear power installed capacity in China will go up from 8700 MW in 2005 to 40,000 MW. It signifies that 30 generating units with a capacity of 1000 MW each will have been built. In fact, the development of nuclear power wants not merely enthusiasm. "The national policy maintains that we should take a road of localized development. This is of great benefit to the expansion of nuclear power in China. However, many people still doubt whether the manufacturing capability and level can meet the requirements of nuclear safety, and multiple introductions are not good for digestion and assimilation, so that there exist potential risks in operation, maintenance and technical support," said Zeng Qingxiong, manager of financing section, Daya Bay Financial Company, China Guangdong Nuclear Power Holding Co. Ltd (CGNPC). By 2020, the nuclear power installed capacity in China will go up from 8700 MW in 2005 to 40,000 MW. It signifies that 30 generating units with a capacity of 1000 MW each will have been built. In fact, the development of nuclear power wants not merely enthusiasm. "The national policy maintains that we should take a road of localized development. This is of great benefit to the expansion of nuclear power in China. However, many people still doubt whether the manufacturing capability and level can meet the requirements of nuclear safety, and multiple introductions are not good for digestion and assimilation, so that there exist potential risks in operation, maintenance and technical support," said Zeng Qingxiong, manager of financing section, Daya Bay Financial Company, China Guangdong Nuclear Power Holding Co. Ltd (CGNPC).
出处 《Electricity》 2006年第3期22-24,共3页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部