期刊文献+

Issues Influencing Power Energy Efficiency in the 11th Five-Year Plan Period

Issues Influencing Power Energy Efficiency in the 11th Five-Year Plan Period
下载PDF
导出
摘要 Since long, power industrial energy-saving specifications, standards and management systems has been systematically established pursuant to state laws, regulations and policies, and been steadily improved through optimization, structure upgrading, and technical retrofitting. The ratio of primary energy transformed into electric energy, the ratio of electric energy consumed by end users and the important power technical and economic indexes which weigh national economic development level, economic efficiency, energy utilization efficiency and environmental protection have been continuously improved and gained significant progress. In particular, along with the rapid development and incessant technical upgrading of Chinese power industry, the commissioning of Left Bank Station of the Three Gorges Hydropower Station, 900-MW (1000-MW class) super-critical coal-fired unit in Waigaoqiao Plant and 750-kV transmission and substation project as representatives indicate the additional part of power development has reached basically the world advanced level. Incessant promotion of power efficiency Since long, power industrial energy-saving specifications, standards and management systems has been systematically established pursuant to state laws, regulations and policies, and been steadily improved through optimization, structure upgrading, and technical retrofitting. The ratio of primary energy transformed into electric energy, the ratio of electric energy consumed by end users and the important power technical and economic indexes which weigh national economic development level, economic efficiency, energy utilization ef-
出处 《Electricity》 2006年第3期36-39,共4页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部