汾河二库枢纽工程主要施工技术

The Main Construction Techniques Adopted in the Key Project of Fenhe Reservoir Two
下载PDF
导出
摘要 汾河二库枢纽工程主要采用了以下施工技术:碾压混凝土采用汽车运输直接入仓,岸坡布设真空复合溜筒垂直运输,坝面施工采用低VC值,斜层碾压技术;常态混凝土以高架门机吊运为主,并配合其他运输方式;33m厚的覆盖层及风化岩采用大开挖机械化施工。 The main construction techniques adopted in the key project of Fenhe Reservoir Two are as follows: roller compacting of the concrete is transported by the automobile directly into the bin, the vertical transportation with the vacuum compound slide-barrel is arranged on the bank slope, the obliquely-layered rolling technique with lower VC value is adopted in the construction of the dam face, the high-portal-framed crane is mainly used for the handling of the normal concrete with the cooperation of other transporting modes, and the mechanized construction of the heavy excavation is adopted for the overburden layer with the thickness of 33 cm and the weathered rock.
作者 杨学宏
出处 《科技情报开发与经济》 2006年第20期276-277,共2页 Sci-Tech Information Development & Economy
关键词 汾河二库 大坝施工 碾压混凝土 常态混凝土 温度控制 Fenhe Reservoir Two dam construction rolled concrete normal concrete temperature control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部